Engineer/Sr.Engineer- Packing Plant Operation
Date: 5 Oct 2025
Location: JH, IN
Company: nuvocovist
- To understand and control all physical flows of Railways rakes - cement (incoming & outgoing) to ensure safe and reliable supply for the given service level..
- He contributes to the overall performance improvement of the Loco section Operations, ensuring coordination and cooperation between his and other Railway operation / railway control room team and Packing Plant shift operations.
- Ensuring coordination and cooperation between his and other contractor’s manpower team to run the Loco operation smoothly.
Ensuring good cooperation with Loco drivers/ attainders for smooth shift operations to meet the daily target.
- Close coordination with packing plant dept, Logistics, Railway commercials and railway staff ( Cabin and controls) for Cement and clinker rake planning
- Close coordination with Packing Plant shift officers for cement rail targeted dispatch.
- Ensuring that he should know the daily Rake planning which circulated by Packing Plant Operation Head as an advance plan for the next day.
- Responsible for complete loco operation with optimized efficiency
- Coordination with Loco Maintenance dept for scheduled maintenance.
- Ensure proper analysis for deviations from set procedures and targets,
- Loco breakdown analysis and feedback to maintenance dept. for corrective actions
- Ensures all employment related standards, programs and procedures, including Health and Safety, are in place and adhered to in order to ensure compliance with the relevant legislation and company policy
- Responsible for safe loco and yard operations in his shift operation activities.
- Responsible for statutory clearances from Railways as and when required basis as a member of team.
- Execute the plan provided by central planning dept. which is shared by Packing Plant Operation Manager.
- Ensuring that he should know about the all rail lines, Points, yard operations.
- He must know the process of railway communications.
- He must know about operation of rail yard, inside and outside of plant.
- He must contribute to maintain the good housekeeping around the full railway yard.
- Ensuring that manpower controlling related track inspection and Loco maintenance by 3rd party.
- Ensuring that in his shift operation, all rakes placement and hand over at given time and without delay.